Define done... Then bump it out.
One of our staff was trying to change things in house photos with AI. Swap the counters, change a railing colour, that kind of thing. He kept going in and asking for the change, and it kept coming back a bit off. The AI wasn't the problem. He never said what done looked like, so the AI had nothing to check its work against.
So I ran the same kind of changes through my render factory. It's an ICM: intake, prepare, generate, composite, QA, deliver. Each stage has a file that says what goes in, what comes out and what has to be true before it moves on.
Three changes on showhome photos:
  1. Kitchen counters to white quartz, using a photo of the actual quartz as the reference.
  2. Stair railing painted the trim colour.
  3. A tiled linear fireplace, taken from a different photo, put on the wall where a long console table was.
The fireplace took two goes. The first one looked right to me. When I showed it to the person who asked for it, they pointed out there's a bump-out on that wall above the fireplace. I hadn't seen it. It's hard to see in the photo. So it went back through: drywall chase above the fireplace, one painting centred on it. The bump-out looks right now.
That second pass is the point. The factory ends with a person signing off, because the AI can reject its own work but it can't approve it.
What made the difference, and who I got it from:
  1. decide what done looks like before you start. My staff member skipped this. Every attempt was a new guess.
  2. set the standard. Danney's the image guy. Give the AI something real to check against. For the counters, that was a photo of the actual quartz. For the fireplace, a photo of the fireplace we wanted. Check out Danney's film courses, they help a ton!
  3. the four rungs, prompt, context, memory, loop. His attempts were all prompt. The factory adds the other three:
  • Context: the original photo plus a cropped sample of the material. Not a whole room. When I gave it a whole room as the reference, it redrew my room.
  • Memory: the rules and lessons live in files, not in my head.
  • Loop: a pixel check that nothing outside the change area moved, then a person.
I am moving the factory into EdubaWare now, for our org to use daily. I have created a complete system in Edubaware to allow for staff to work collaboratively in one location, using the principle of ICM.
9
10 comments
Jeff Van Leenen
6
Define done... Then bump it out.
Clief Notes
skool.com/cliefnotes
What we give away free beats most paid courses. 40+ lessons, growing.
Leaderboard (30-day)