Most underbidding happens before the calculator.
Here’s what I always review first:
• Wall type legend
• Reflected ceiling plan
• Spec section 09 29 00
• Door schedule backing
• Ceiling height differences
Missing one of these can erase your profit.
What’s the most expensive thing you’ve ever missed in a plan set?