Before I ever submit a number, I check:
1️⃣ Wall Type Legend – Gauge, fire rating, shaft walls
2️⃣ Reflected Ceiling Plan – Bulkheads, soffits, height changes
3️⃣ Spec Section 09 29 00 – Board type and finish level
4️⃣ Door Schedule – Backing requirements
5️⃣ Insulation Responsibility – Who owns it?
Most contractors don’t lose money on labor.
They lose money on missed scope.
What’s the biggest thing you’ve ever missed in a set of plans?