We've encountered an interesting challenge on a recent project in our design pipeline requiring articulations along the road facing side.
The city is calling for what may be some deep articulations (4-5' deep) every 50' along the building.
Curious if anyone else has encountered this and how they put a positive spin on it to maintain as much rentable space as possible.