One lesson that's helped me is understanding that the Single Line Diagram (SLD) should not be measured directly. The SLD's purpose is to show what equipment exists (MSBs, DBs, MPs, MCCs, transformers, etc.), what connects to what, the cable sizes, protection devices, and overall system logic. It is not a scale drawing, so it won't give you actual cable lengths. I used to go crazy when I had to do temp power for a power plant so this is The process I follow: 1. Extract the circuit information from the SLD - Origin (e.g., MSB) - Destination (e.g., DB-L2) - Cable size/type - Containment type (tray, ladder, conduit, etc.) - Locate those boards/equipment on the floor plans - Measure the actual containment route, not a straight-line distance. - Follow corridors, risers, cable trays, conduits, and electrical rooms. - Convert the measurement into a real cable length - Horizontal distance from the plan. - Add vertical rises/drops into switchboards and distribution boards. - Add floor-to-floor riser lengths where applicable. - Add termination tails at each end. - Add a small slack allowance (typically 5-8%). - Cross-check everything - The SLD tells me what should be connected. - The floor plan tells me where it is. - The cable schedule tells me what size cable to allow. For Groundplan, I've found the biggest mistake is measuring only the 2D plan length. Most misses come from forgetting vertical drops, risers, switchboard entries, and termination allowances. Coming from substation estimating, we use a similar principle: the one-line tells us the connection logic, while the GA/layout drawings provide the actual quantities. I'd also be interested if anyone has a structured workflow or checklist specifically for Groundplan when measuring sub-mains and main power distribution circuits.