Activity
Mon
Wed
Fri
Sun
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
What is this?
Less
More
2 contributions to Construction Contractors Hub
Right Path
In my experience, most clients begin a project without having the necessary permit-ready drawings. They often discover later, through the city or other relevant authorities, that construction cannot proceed without these plans, forcing them to commission the drawings at a later stage. However, this can result in costly revisions to work that may already be underway. Therefore, it is always better to have the necessary drawings completed and approved before construction begins.
0
0
I got Claude to do the electrical design for a warehouse
I gave Claude a set of 2D structural drawings, a made-up client brief (lighting levels, power needs, where the street supply comes in) and AS 3000, and asked for a full electrical design: lighting and power layouts, switchboards, cable tray, a single-line diagram and a cable schedule. One prompt didn't work. Cable tray ran through the middle of the building and there were gaps in the lighting. Claude wrote its own checks and passed itself, but an independent check found most of the cables failed voltage drop. What worked was splitting the job into stages, each in a fresh chat: - Get Claude to grill you with questions until it understands the job, then save that as a plan - In a new chat, break the plan into stages with pass/fail checks for each (lighting meets the minimum lux, voltage drop within limits) - Lock in the big decisions first (main switchboard position), then lighting, then distribution boards and cable routes, and value engineer before the detailed drawings - After each stage, run the checks, then ask a fresh chat "is this right, and what would you change?" The result is only as good as the engineer checking it. I'm not much of an electrical designer, so treat this as a proof of concept, not drawings to build from. Free resource: Matt Pocock's skills (https://github.com/mattpocock/skills). Free, open-source Claude skills, including the "grill me" one I adapted for the questioning step. Would you trust AI with any part of your design work? https://www.youtube.com/watch?v=k6Qzw2rpxts
0 likes • 21m
Thanks to you, I've learned about a great service.
1-2 of 2
Brett Delmez
1
5 points to level up
@brett-delmez-4062
Licensed Architect | Helping Builders & Contractors Fast-Track Permits & Maximize Project ROI 🏗️

Active 1m ago
Joined Nov 22, 2026
United States
Powered by