We had call out for replace an old broken concrete slab was causing trip hazard and.safety issues. We installed 12mm bars with anchor ⚓️ rods . C50 type concrete been used with fibre additional and fastener.
The time frame for work was so tight as high traffic are ( bus wash )
It been all completed within 5 hours. All been covered up with road plates and redy for traffic
Plates will be removed after 7 days