Activity
Mon
Wed
Fri
Sun
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
What is this?
Less
More

Owned by Andras

Building Contractors &DIY Design

Memberships

Construction Contractors Hub

145 members • Free

‎Skoolyard 🧃

751 members • Free

Skoolers

190k members • Free

7 contributions to UK BUILDING CONTRACTORS
PORCH PROJECT.
Hi everyone. We built a new porch period of 7 days . Only an open.porch with 2 brick pillar and a single flat roof with a shipflap design ceiling with decorative mini coving. On the floor 600x600 sandstone slabs . The base concrete slab contains fibre additions and 12 mm rebarrs connected in a way as mesh formation. Above door way seperate wood plate been installed and roof plate connected with timber lock tyoe screws i can post the whole project documentation. Text me guys who wanna see my porch project
EMERGENCY SLAB REPLACEMENT
We had call out for replace an old broken concrete slab was causing trip hazard and.safety issues. We installed 12mm bars with anchor ⚓️ rods . C50 type concrete been used with fibre additional and fastener. The time frame for work was so tight as high traffic are ( bus wash ) It been all completed within 5 hours. All been covered up with road plates and redy for traffic Plates will be removed after 7 days
EMERGENCY SLAB REPLACEMENT
Dranage replacement
Hi everyone. We documented a few step how to replace dranage easily even around high traffic areas.( project completed 15hrs period) 2 tradesmen. The dranage channel classification is D400 . Mean should handle 40 T weight. Concrete complete strength is 28 days. 75% strength after 7days ramp can be moved.
Dranage replacement
1-7 of 7
Andras Toth
3
42points to level up
@andras-toth-7001
BUILDING TRADE. DIY,maintenance,New build, Creative fabrication.

Active 7h ago
Joined Dec 10, 2025
St albans
Powered by