User
Write something
Monthly Networking is happening in 7 days
THEY SAID IT COULDN’T BE DONE.
Sometimes the most valuable thing in real estate isn’t the property. It’s the right to control it. In 2025, I negotiated a Right of First Refusal on 1.46 acres in downtown Asheville, North Carolina. The vision? A 16-story ultra-luxury development with condominiums, a boutique hotel, and rooftop hospitality. The problem? We weren’t ready to raise the capital required to build it. So instead of walking away, I negotiated time. Five years of contractual protection. And here’s the part I love. For another $10, I secured the contractual right to extend that protection for five additional years. No new negotiation. No seller approval required under the extension provision. Potentially through 2035. While others questioned whether I could pull it off, I was focused on protecting the opportunity. Now we’re building THE YARDS, establishing our track record, developing investor relationships, and creating the capital platform for projects of increasing scale. The Asheville vision is still alive. Control First. Structure Before Price. Long-Term Ownership. You don’t always need the money to build the building today. Sometimes you need the foresight to make sure the opportunity is still there when you’re ready. That’s THE YARDS.
Canopy Installation
We just installed these canopies over in Midlothian earlier last week. 4'x4' canopies with an 8" facia. A lot of times we see guys just mount the canopies directly to the R-panel but in the long run this will cause not only a liability issue but will start to pull and separate the wall tin from the girts. We had our guys install an anchoring system behind the wall using 6" purlins so that all the stress is pulling against the purlins and sandwiching the tin between the girts and the canopy. Build it strong, make it reliable and long lasting, and never cut corners for appearance sake... that may result in some unpleasant discussions with lawyers in the future.
Canopy Installation
Approved Facade Grant Reimbursement
Update on the renovation project I’ve been managing in Louisiana from Austin, TX. This property is located inside a downtown district where the city offered two different grants encouraging owners to make upgrades to their building exteriors For the Facade Grant they covered 50% of the Paint/Labor cost: $5,500 total (we get back $2,750) For the Lighting Grant they cover 100% labor and materials- ($1,750) All in they’re cutting a check back to us for $4,500, so we managed to upgrade the entire facade of this 2,650sqft building for $2,750🔥 ($7,250 before reimbursement) Total in this project so far: -45k purchase -35k in rehab so far -probably another $5k in final punch list items -$85k total -Hoping to hit $2,100-$2,300/mo once leased
Approved Facade Grant Reimbursement
Today’s Networking Call
If you missed today’s Small Bay / Basecamp networking call, make the next one. Not because anyone was pitching. Quite the opposite. We had people openly sharing what is working, what is not, and where deals are breaking. A few things I took away: - Ground-up construction is getting punished by cost. One developer walked away after the spread dropped below a point and cash-on-cash fell under 6%. - Several experienced operators are shifting toward existing value-add assets instead of trying to build everything from scratch. - Phasing matters. One operator is building only 12 units first — with LOIs already in hand — before deciding what the market wants next. - Capital structure matters as much as the real estate. - Sometimes the answer is not figuring out how to build cheaper. It is figuring out what already exists and putting it back to productive use. And then you get the stuff that never shows up in a webinar: contractor relationships, entitlement lessons, financing problems, marketing systems, mistakes, local market intelligence and actual numbers. That is the value of these calls. Exposure. You hear how other people think. You hear where they got hurt. You hear what they are testing. And every once in a while, somebody says one sentence that changes how you look at your own deal. No presentation. No polished case study. Just operators talking to operators. If you were not on this one, be on the next one. The conversations after the introductions are where the value is.
What's the one due-diligence item that bit you on your first small-bay project?
Harvey's post about the 170+ mph wind load requirement catching him by surprise near the Gulf got me thinking - underwriting a small-bay deal for the first time, and it feels like there's always one item that doesn't show up until you're deep into design/permitting, not during the initial pro forma. Wind load, soil/geotech surprises, utility capacity, a jurisdiction's specific fire-rating requirement for demising walls, whatever it was for you. For those a few projects in - what's the thing you now check before going under contract that you didn't think to check on your first deal, and how much did skipping it cost you the first time around?
1-13 of 13
Small Bay Industrial Basecamp
skool.com/small-bay-basecamp
Small bay industrial investing — market intel, industry insights, and a network of active investors building success together. Free to join.
Leaderboard (30-day)
Powered by