Imagine this situation. A contractor is supposed to transport materials using a trolley. However, due to site constraints, the supervisor decides to use a chain block instead. The workers are ready to proceed. The supervisor says: "Same materials, same location. Just a different method." ⚠️ But here's the question: Does the existing Risk Assessment still cover the actual work? Changing the work method can introduce new hazards, such as falling loads, equipment failure, crushing injuries and inadequate lifting arrangements. 💡 5 Things WSH Personnel Should Do ✅ 1. Identify the Change Understand what has changed — equipment, work method, location or sequence. ✅ 2. Assess the New Risks Identify hazards introduced by the revised method. ✅ 3. Review the RA and SWP Update the documents where necessary to reflect the actual activity. ✅ 4. Implement the Controls Ensure suitable equipment, competent personnel and necessary safety measures are in place. ✅ 5. Brief and Verify Communicate the revised method and verify the controls before work proceeds. 📋 The Real Lesson An approved Risk Assessment does not mean every alternative work method is automatically safe. Under Singapore's WSH risk-management framework, significant changes in work practices or procedures require the risk assessment to be reviewed and revised where necessary. As WSH personnel, our role is not just to check whether documents are approved. We must ensure the actual work is properly assessed and controlled. 🎯 Remember: "CHANGE THE METHOD? REASSESS THE RISK." 💬 Community Discussion What is the most common reason workers deviate from approved work methods? A️⃣ Pressure to complete work quickly B️⃣ Equipment or manpower limitations C️⃣ Impractical RA or SWP D️⃣ Poor communication between supervisors and workers Share your experience below. #RoutSafetyCommunitySG #WSHO #WSHC #RiskAssessment #SingaporeWSH #ConstructionSafety