Activity
Mon
Wed
Fri
Sun
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
What is this?
Less
More

Owned by Todd

Learn the trade. Understand the code. Build your skills with practical electrical courses, exam prep, and a community of apprentices and electricians.

65 contributions to The Junction Box
😂⚡ When Your Daughter Says She Wants to Be a Transformer for Halloween…
Dad's an electrician, so naturally he understood the assignment a little differently! 🤣 Forget Optimus Prime… meet 240 Prime! ⚡ She's ready to step down the voltage and step up the candy collection! 🍬🎃 The Junction Box — Connecting Electrical Concepts! ⚡
0
0
😂⚡ When Your Daughter Says She Wants to Be a Transformer for Halloween…
🏗️ Construction Drawings Is Now 100% Complete!
I’m excited to announce that the full Construction Drawings course is now available in The Junction Box classroom. Inside the course, you’ll learn how to: - Navigate a complete drawing set - Read electrical symbols, legends, schedules, and specifications - Use architect and engineer scales - Verify that a printed plan is properly scaled - Coordinate electrical work with other trades - Handle revisions, RFIs, and as-built drawings - Follow the Copper Ridge Charter School plan set - Complete a basic lighting takeoff and bid The course includes six complete lessons, downloadable worksheets and answer keys, practical activities, videos, graphics, the Copper Ridge coordinated plan set, and a final 22-question Check Your Knowledge assessment. Whether you’re an apprentice learning to read prints or an experienced electrician sharpening your skills, this course is designed to connect the drawings to the work that actually gets installed. Head over to the Classroom and start the Construction Drawings course today! The Junction Box — Connecting Electrical Concepts
1
0
🏗️ Construction Drawings Is Now 100% Complete!
Test-Prep Question — Three-Phase Current
A balanced three-phase load is rated at 45 kVA and supplied at 480 volts. Approximately how much line current does the load draw? A. 31.3 amps B. 54.1 amps C. 93.8 amps D. 162.4 amps
⚡️Trade Question of the Day — Heat Anticipator⚡️
What is the primary purpose of the adjustable heat anticipator found in some heating-only thermostats? A. Increase the system’s supply voltage B. Keep the blower operating continuously C. Open the heating circuit slightly before the room reaches the set temperature D. Prevent the compressor from receiving liquid refrigerant Answer will drop in a couple days. 👍
⚡️Trade Question of the Day — Heat Anticipator⚡️
1 like • 2d
Answer: C. Open the heating circuit slightly before the room reaches the set temperature A heat anticipator is a small resistance heater connected in series with the heating control circuit. It warms the thermostat’s sensing element so the contacts open slightly before the room reaches the selected temperature. The remaining heat in the furnace, ductwork, and building continues warming the room after the burner shuts off. Opening the circuit early helps reduce temperature overshoot and improves comfort. Discussion question: What might happen if the heat anticipator is adjusted incorrectly?
🚩 In the Wild — Location, Location… Electrocution?
Some installations make you stop and ask, “How did we end up here?” This inspection photo shows a breaker panel beside a shower. The original inspector also reported a toilet directly below and in front of the panel, obstructing the working space. Here’s how this location compares with the 2023 NEC: 🔹 240.24(E) — Bathroom locations: Overcurrent protective devices, other than supplementary overcurrent protection, are prohibited in bathrooms, showering facilities, and locker rooms with showering facilities. 🔹 110.26(A)(1) and Table 110.26(A)(1) — Working-space depth: For typical residential equipment operating at 120 volts to ground, the minimum clear working depth is 3 feet. A toilet cannot occupy that required space. 🔹 110.26(A)(2) — Working-space width: The clear working width must be at least 30 inches or the equipment’s width, whichever is greater, and must allow equipment doors to open at least 90 degrees. The panel does not have to be centered within that width. The lesson: Panel placement matters just as much as the wiring inside it. We need a suitable location and clear space to operate and service the equipment. This photo was originally posted in 2009. We’re using the 2023 NEC as today’s learning reference, rather than assuming which rules applied when it was installed. What catches your eye first? Have you encountered a panel in an unexpected location? Share your story—no code number required! 📷 Photo credit: Justin Nickelsen, Nickelsen Home Inspections, via ActiveRain. Original inspector’s post: https://activerain.com/blogsview/1298671/in-the-field--electrical-panel-in-bathroom-by-shower
🚩 In the Wild — Location, Location… Electrocution?
1 like • 3d
@Tara Johnston Got any pictures of your panel installations? How many panels total do you have? It's smart to have multiple panels if you have a long house. It helps with voltage drop and running branch circuits. Not by your shower though!! 😂
1-10 of 65
Todd Daugherty
5
348 points to level up
@todd-daugherty-2603
Former Naval Electrician’s Mate, 20+ years Electrical Contractor and Credentialed CTE Instructor. "Teaching what works"

Active 4h ago
Joined Jun 7, 2026