CALL TO ACTION: THE SILENCE AUDIT
"Silence in the construction site means the building has stopped. Where did you go?" Architects, I’m looking at the room and I see the Identity Drag in full effect. We moved into Week 4: The Sovereign Scale, and suddenly, some of you have gone quiet. Do you know why? It’s because resigning from the Floor is terrifying for a Consumer. You have spent your whole life being rewarded for how much you DO, how much you SACRIFICE, and how EXHAUSTED you are. Now that I’m asking you to step onto the Throne and lead through Governance, your old ego is trying to pull you back into the shadows of busy-ness. If you aren't posting your Letter of Resignation, it’s because you are still negotiating with a version of yourself that doesn't exist anymore. We are not "trying" to scale; we are engineering scale. If you haven't completed The Delegation Audit, you are choosing to stay an employee in your own life. I need a Pulse Check right now. Post your status below: 1. THE RESIGNATION: If you did the work but haven’t posted it on the previous post, drop your Letter of Resignation below. 2. THE BLOCK: If you haven't posted, what is the Assumption stopping you? (e.g., "I assume I’m not ready," "I assume I have to do it all"). 3. THE RECOMMITMENT: Drop a "🏛️" if you are stepping back onto the construction site shortly. The new version of you does not hide when things get technical. He/she governs, show me you’re still in the build.