Activity
Mon
Wed
Fri
Sun
Oct
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
What is this?
Less
More
Finisher's Skool

48 members • Free

Big Business Entrepreneurs

21.6k members • Free

29 contributions to Finisher's Skool
Hobbit House
Just finished a nice Hobbit House project. This building has been filled over with soil just revealing the doors and windows. This was finished in a Nova color KS .
Hobbit House
1 like • 7d
@Thomas Jordan process is as follows for a full belt and braces system. Epoxy primer coat rolled on then casted with dry kiln sand to create a key. 160gram fiber mesh layed. X2 epoxy base coats and casted with kiln sand. Sanding with 50grit diamond pads between coats 1 large grain top coat then Sanded 50g sanding pad Then either large, medium or smooth top coat to finish then sanded back with 50g , then 100g diamond pad. Followed by X2 coats of duo sealer.
1 like • 4d
I'll put one together on my next installment
Microcement flooring
Recently completed Microcement floor.. 😁🫶
Microcement flooring
1 like • 19d
Luna hydro plaster
1 like • Jun 24
@Thomas Jordan thanks mate. I have a large ceiling to do soon which is going to look amazing.
2 likes • Jun 25
@Thomas Jordan same here 😉
Little something I've been working on
Full Microcement bathroom complete. Natural finish to the ceiling, Rustic floated finish to the walls and a smooth refined finish to the unit and the floor.
Little something I've been working on
1 like • Jun 24
@Thomas Jordan thanks buddy
1 like • Jun 24
@Thomas Jordan nice colour 👍
Another Microcement project completed
Ceiling, floor and walls all completed in a rustic looking Microcement. Colour is called Honey2 which is a subtle warm yellow.
Another Microcement project completed
2 likes • Apr 4
@Best Of all thanks mate 👌
1 like • Apr 5
@Thomas Jordan correct or forcrete , same company
1-10 of 29
Michael Bryant
4
25 points to level up
@michael-bryant-5270
Decorative wall designer and Microcement installer

Active 4d ago
Joined Nov 9, 2025
Oxford UK