PIE 7.1 Lower Assembly Work
The PIE 7.1 is getting closer to a proper test phase. Pulse timing is spot-on now and the rubber insulators are installed to quiet the assembly without negatively affecting operation.
Check out the progress in the Classroom Workshop... https://www.skool.com/inertial-propulsion-workshop-9027/classroom
0
0 comments
Bryan StClair
4
PIE 7.1 Lower Assembly Work
powered by
Inertial Propulsion Workshop
skool.com/inertial-propulsion-workshop-9027
We build electric engines that generate real thrust with no propellant.
Build your own community
Bring people together around your passion and get paid.
Powered by